skip to content

Displaying 1-2 of 2
  • Olympic House

    Olympic House

    Drilling of 12-18 metre trenches, into which the recycled concrete will be poured to build the slurry wall.
    Thursday, June 6, 2019 12:43 PM | Photo
  • Olympic House

    Olympic House

    Steel cage placed in the 12-18 metre trenches. Concrete will then be poured in to form the slurry wall.
    Friday, June 7, 2019 12:43 PM | Photo
back to top Fr